Name: | USG Interiors, LLC |
Jurisdiction: | MISSISSIPPI |
Business Type: | Limited Liability Company |
Status: | Good Standing |
Effective Date: | 24 Apr 2012 (13 years ago) |
Business ID: | 1000735 |
State of Incorporation: | DELAWARE |
Principal Office Address: | 550 W Adams StreetChicago, IL 60661 |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | Agent | 645 LAKELAND EAST DRIVE, Suite 101, FLOWOOD, MS 39232 |
Name | Role | Address |
---|---|---|
United States Gypsum Company | Member | 550 W Adams Street, Chicago, IL 60661 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report LLC | Filed | 2025-02-13 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2024-02-09 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2023-02-04 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2022-02-22 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2021-04-15 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2020-03-26 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2019-03-20 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2018-03-29 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2017-03-28 | Annual Report For USG Interiors, LLC |
Annual Report LLC | Filed | 2016-04-04 | Annual Report For USG Interiors, LLC |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
344629589 | 0419400 | 2020-02-13 | 850 NORTH BROADWAY, GREENVILLE, MS, 38701 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1542413 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1462995 |
Health | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 19100147 C04 II C |
Issuance Date | 2020-02-27 |
Abatement Due Date | 2020-03-20 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2020-03-25 |
Nr Instances | 1 |
Nr Exposed | 4 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(4)(ii)(C): The energy control procedure did not clearly and specifically outline the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them: (a) #3 Board Mill Kiln - On or about February 13, 2020 the procedures for removing kiln plug ups did not clearly outline the steps for the placement and removal of lockout or tagout devices on the circulating fans. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Health |
Close Conference | 2020-02-13 |
Case Closed | 2020-02-14 |
Related Activity
Type | Referral |
Activity Nr | 1542413 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1462958 |
Safety | Yes |
Date of last update: 16 Feb 2025