Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2015-05-07
|
Emphasis |
N: AMPUTATE, L: FORKLIFT
|
Case Closed |
2015-09-16
|
Related Activity
Type |
Complaint |
Activity Nr |
981018 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19100024 H |
Issuance Date |
2015-08-31 |
Current Penalty |
1224.0 |
Initial Penalty |
2040.0 |
Final Order |
2015-09-14 |
Nr Instances |
2 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.24(h): Standard railings were not provided on the open sides of all exposed stairways and stair platforms: a) On or about May 7, 2015 the metal stairway in the De-stacker area lacked a mid-rail on open sides exposing employees to a fall hazard. b) On or about May 7, 2015 the metal stairway leading to platform in the chemical mixing area lacked a mid-rail on open sides exposing employees to a fall hazard. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100132 D01 |
Issuance Date |
2015-08-31 |
Abatement Due Date |
2015-09-23 |
Current Penalty |
1440.0 |
Initial Penalty |
2400.0 |
Final Order |
2015-09-14 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE: a) On or about May 7, 2015 the employer had not conducted a hazard assessment to address overhead hazards when loading the Kiln. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19100219 H01 |
Issuance Date |
2015-08-31 |
Current Penalty |
1224.0 |
Initial Penalty |
2040.0 |
Final Order |
2015-09-14 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(h)(1): Projecting key(s), setscrew(s), or other projections in revolving part(s) were not removed, made flush, or guarded by metal cover(s): a) On or about May 7, 2015 the keyway on the end of a projecting shaft on the Rip Saw Out Feed was not flush or guarded exposing employees to the hazard of being entangled with a rotating part. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19100265 C18 I |
Issuance Date |
2015-08-31 |
Current Penalty |
1224.0 |
Initial Penalty |
2040.0 |
Final Order |
2015-09-14 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.265(c)(18)(i): Pulley(s), sprocket(s), sheave(s), drum(s) and block(s) of conveyor(s) were not arranged to prevent the possibility of injury due to hands or parts of clothing being caught between the belt(s) and pulley(s) or chain(s) and sprocket(s): a) On or about May 7, 2015 the chain and sprocket drive mechanism on the planner out feed conveyor lacked a guard exposing employees to the hazard of being mangled or entangled in moving parts. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19100305 G02 III |
Issuance Date |
2015-08-31 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2015-09-14 |
Nr Instances |
2 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws. a) On or about May 7, 2015 the electrical cord on the Scissor lift did not have strain relief. b) On or about may 7, 2015 the skill saw electrical cord did not have strain relief. |
|
|