Name: | WAR Construction, Inc. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 28 May 1981 (44 years ago) |
Branch of: | WAR Construction, Inc., ALABAMA (Company Number 000-019-827) |
Business ID: | 202421 |
State of Incorporation: | ALABAMA |
Principal Office Address: | 4300 Joe Mallisham ParkwayTuscaloosa, AL 35401 |
Historical names: |
WEST ALABAMA REMODELING, INC. |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | Agent | 645 LAKELAND DRIVE EAST DR., STE 101, FLOWOOD, MS 39232 |
Name | Role | Address |
---|---|---|
Phillip Mark Lancaster, II | Director | Post Office Box 1218, Tuscaloosa, AL 35403 |
Andrew C Jackson, II | Director | Post Office Box 1218, Tuscaloosa, AL 35403 |
Barkley Will Mallette | Director | PO Box 1218, Tuscaloosa, MS 35403 |
Hugh B Mallette | Director | Post Office Box 1218, Tuscaloosa, AL 35403 |
Name | Role | Address |
---|---|---|
Phillip Mark Lancaster, II | President | Post Office Box 1218, Tuscaloosa, AL 35403 |
Name | Role | Address |
---|---|---|
Andrew C Jackson, II | Vice President | Post Office Box 1218, Tuscaloosa, AL 35403 |
Name | Role | Address |
---|---|---|
Barkley Will Mallette | Secretary | PO Box 1218, Tuscaloosa, MS 35403 |
Name | Role | Address |
---|---|---|
Barkley Will Mallette | Treasurer | PO Box 1218, Tuscaloosa, MS 35403 |
Name | Role | Address |
---|---|---|
Hugh B Mallette | Chief Executive Officer | Post Office Box 1218, Tuscaloosa, AL 35403 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2024-01-25 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2023-01-18 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2022-10-21 | Annual Report For WAR Construction, Inc. |
Notice to Dissolve/Revoke | Filed | 2022-09-05 | Notice of Intent to Dissolve: AR: WAR Construction, Inc. |
Annual Report | Filed | 2021-07-20 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2020-05-13 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2019-05-16 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2018-04-13 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2017-07-25 | Annual Report For WAR Construction, Inc. |
Annual Report | Filed | 2016-09-19 | Annual Report For WAR Construction, Inc. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345308035 | 0419400 | 2021-05-11 | 611 WEST MAIN STREET, FULTON, MS, 38843 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Other |
Standard Cited | 19260304 G01 |
Issuance Date | 2021-07-28 |
Current Penalty | 4681.0 |
Initial Penalty | 4681.0 |
Final Order | 2021-12-08 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.304(g)(1): The sides of the lower blade were not guarded to the full diameter of the blade by a device that would automatically adjust itself to the thickness of the stock and remain in contact with stock being cut to give maximum protection (a) Jobsite - On or about May 11, 2021 employer did not ensure that a Makita radial arm saw guard automatically adjusted itself to the thickness of wood stock being cut, exposing the operator from struck-by hazards. |
Citation ID | 01002 |
Citaton Type | Other |
Standard Cited | 19261412 F01 |
Issuance Date | 2021-07-28 |
Current Penalty | 1819.0 |
Initial Penalty | 3901.0 |
Final Order | 2021-12-08 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1412(f)(1):At least every 12 months the equipment was not inspected by a qualified person in accordance with paragraph (d) of this section(each shift): (a) Jobsite On or about May 11, 2021 the employer did not ensure a complete annual inspection was performed for a Terex TC2863 15 ton truck crane exposing employees to a struck-by hazard. |
Date of last update: 08 Mar 2025
Sources: Mississippi Secretary of State