Name: | KENTUCKY-TENNESSEE CLAY COMPANY |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 10 Jan 1952 (73 years ago) |
Business ID: | 306528 |
State of Incorporation: | DELAWARE |
Principal Office Address: | 100 Mansell Court East, Suite 300Roswell, GA 30076 |
Name | Role | Address |
---|---|---|
CORPORATION SERVICE COMPANY | Agent | 109 Executive Drive, Suite 3, Madison, MS 39110 |
Name | Role | Address |
---|---|---|
James Murberger | Director | 100 Mansell Court East, Suite 300, Roswell, GA 30076 |
Francois Michel | Director | 100 Mansell Court East, Suite 300, Roswell, GA 30076 |
Name | Role | Address |
---|---|---|
John Carroll | Treasurer | 100 Mansell Court East, Suite 300, Roswell, GA 30076 |
Name | Role | Address |
---|---|---|
Todd Swanger | President | 100 Mansell Court East, Suite 300, Roswell, GA 30076 |
Name | Role | Address |
---|---|---|
Ryan Van Meter | Secretary | 100 Mansell Court East, Suite 300, Roswell, GA 30076 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2025-03-20 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2024-03-19 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2023-04-04 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Amendment Form | Filed | 2023-01-03 | Amendment For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2022-03-12 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2021-04-06 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2020-03-19 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2019-03-05 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2018-03-22 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Annual Report | Filed | 2017-02-20 | Annual Report For KENTUCKY-TENNESSEE CLAY COMPANY |
Mine Name | Type | Status | Primary Sic | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Crenshaw Mine and Plant | Surface | Active | Kaolin and Ball Clay | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name | Kentucky-Tennessee Clay Company |
Role | Operator |
Start Date | 1986-07-17 |
End Date | 2001-03-27 |
Name | Kentucky-Tennessee Clay Company |
Role | Operator |
Start Date | 1950-01-01 |
End Date | 1983-03-28 |
Name | Kentucky-Tennessee Clay Company |
Role | Operator |
Start Date | 1983-03-29 |
End Date | 1986-07-16 |
Name | Kentucky-Tennessee Clay Company |
Role | Operator |
Start Date | 2001-03-28 |
Name | Imerys S A |
Role | Current Controller |
Start Date | 2001-03-28 |
Name | Kentucky-Tennessee Clay Company |
Role | Current Operator |
Accidents
Accident Date | 2017-06-30 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Struck by falling object |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | WORKING ON BELLY PAN ON DOZER. BELLY PAN FELL OFF THE JACK AND SMASHED FINGER ON RIGHT HAND |
Accident Date | 2017-05-23 |
Degree Inhury | DAYS RESTRICTED ACTIVITY ONLY |
Accident Type | Struck by falling object |
Ocupation | Forklift operator |
Narrative | Employee was putting a fork on the forklift when they lost control of the fork and it fell striking their right foot. The blow caused a small cut on the top of the right foot just above the steel toe on their boot |
Accident Date | 2016-04-06 |
Degree Inhury | DYS AWY FRM WRK & RESTRCTD ACT |
Accident Type | Fall onto or against objects |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | Shredder hopper was sitting on floor. Employee was preparing to hook chains to the hopper and loader. When the employee put EE's weight on the hopper, it moved causing the employee to hit loader bucket with EE's back. The rim of the hopper struck the employee in the stomach and rib area. The employee's back and ribs were bruised. |
Accident Date | 2014-07-29 |
Degree Inhury | DAYS AWAY FROM WORK ONLY |
Accident Type | Over-exertion in pulling or pushing objects |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | He was pulling something out of a track-hoe and hurt his right elbow. |
Accident Date | 2011-07-01 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by flying object |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | Employee was cleaning Carbon Testing Machine when her eyes began to burn. She washed her eyes with eye wash solution. It seemed to help. Employee worked the remainder of her shift and on her way home her eyes continued burning so she decided to go to the doctor. Employee was back at work on Tuesday which was her next regular scheduled day to work. |
Accident Date | 2005-07-10 |
Degree Inhury | DAYS RESTRICTED ACTIVITY ONLY |
Accident Type | Over-exertion NEC |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | While racking loose material from underneath a rail car employee developed stiffness in his back. |
Accident Date | 2003-07-28 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Absorption of radiations, caustics, toxic and noxious substances |
Ocupation | Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator |
Narrative | EE WAS WORKING ON THE TRUCK LOADING PLATFORM. THIS AREA IS LESS TRAVELED THAN ANY OTHER AREA OF THE PLANT. THE STEEL H BEAMS ARE A PRIME LOCATION FOR WASPS TO BUILD NESTS. AS HE WAS PERFORM ING HIS REGULAR DUTIES IN THE AREA WHERE A NEST WAS LOCATED, HE WAS STUNG BY WASPS ON THE CHEEK & THE BACK. |
Accident Date | 2003-03-05 |
Degree Inhury | DAYS RESTRICTED ACTIVITY ONLY |
Accident Type | Fall to the walkway or working surface |
Ocupation | Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech |
Narrative | EE WAS WALKING THROUGH THE PLANT, HE STEPPED AND SLIPPED ON A WET SPOT ON THE FLOOR. WATER/WET SPOT WAS OBSCURED BY DUST. THE INCIDENT OCCURRED IN THE 53 MILL AREA. |
Accident Date | 2002-12-12 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator |
Narrative | EMPLOYEE ATTEMPTED TO FILL PROPANE TNAK FOR FORKLIFT. AFTER FILL LINE WAS CONNECTED TO TANK, GAS WOULD NOT FLOW INTO TANK. EMPLOYEE REMOVED FILL LINE TO CHECK FOR OBSTRUCTION, AT THIS POINT, A BURST OF GAS FROM THE VALVE ON TANK HIT EMPLOYEE ON RIGHT CHEEK AND EYE. |
Accident Date | 2002-09-16 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Fall onto or against objects |
Ocupation | Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman |
Narrative | HANGING WALL GIRTS HE STEPPED IN MUD, LOST FOOTING AND FELL, HITTING ARM ON COLUMN FLANGE. |
Accident Date | 2000-10-10 |
Degree Inhury | NO DYS AWY FRM WRK,NO RSTR ACT |
Accident Type | Struck by... NEC |
Ocupation | Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer |
Narrative | THICK HEAVY BRUSH RESTRICTED BODY MOTION. |
Inspections
Start Date | 2024-11-19 |
End Date | 2024-11-19 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.5 |
Start Date | 2024-09-05 |
End Date | 2024-09-05 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 7.5 |
Start Date | 2024-05-22 |
End Date | 2024-05-22 |
Activity | Special Emphasis Programs |
Number Inspectors | 1 |
Total Hours | 2.25 |
Start Date | 2024-03-05 |
End Date | 2024-03-05 |
Activity | Impoundment Spot Inspection |
Number Inspectors | 1 |
Total Hours | 1 |
Start Date | 2024-03-04 |
End Date | 2024-03-06 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.5 |
Start Date | 2023-09-20 |
End Date | 2023-09-20 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 9 |
Start Date | 2023-01-30 |
End Date | 2023-01-31 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 21 |
Start Date | 2022-07-20 |
End Date | 2022-07-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.5 |
Start Date | 2022-02-14 |
End Date | 2022-02-22 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 20.5 |
Start Date | 2021-08-03 |
End Date | 2021-08-05 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 27 |
Start Date | 2021-02-22 |
End Date | 2021-02-23 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 15.5 |
Start Date | 2020-04-20 |
End Date | 2020-04-21 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 23 |
Start Date | 2020-02-24 |
End Date | 2020-02-25 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 24 |
Start Date | 2020-01-27 |
End Date | 2020-02-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 24.25 |
Start Date | 2019-06-04 |
End Date | 2019-06-05 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2018-11-26 |
End Date | 2018-11-27 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 16 |
Start Date | 2018-06-12 |
End Date | 2018-06-12 |
Activity | Spot Inspection |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2018-05-16 |
End Date | 2018-05-17 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 19.25 |
Start Date | 2017-10-03 |
End Date | 2017-10-04 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 20.25 |
Start Date | 2017-08-14 |
End Date | 2017-08-16 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 34 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2024 |
Annual Hours | 4734 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2367 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2024 |
Annual Hours | 20541 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 1712 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2024 |
Annual Hours | 8937 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2234 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2023 |
Annual Hours | 4593 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2297 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2023 |
Annual Hours | 28444 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 14 |
Avg. Employee Hours | 2032 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2023 |
Annual Hours | 9109 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2277 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2022 |
Annual Hours | 5003 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 2502 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2022 |
Annual Hours | 30203 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 13 |
Avg. Employee Hours | 2323 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2022 |
Annual Hours | 8041 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 2680 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2021 |
Annual Hours | 1385 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 2 |
Avg. Employee Hours | 693 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2021 |
Annual Hours | 33193 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 2213 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2021 |
Annual Hours | 9072 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2268 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2020 |
Annual Hours | 21771 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 12 |
Avg. Employee Hours | 1814 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2020 |
Annual Hours | 13224 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 7 |
Avg. Employee Hours | 1889 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2019 |
Annual Hours | 27550 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 14 |
Avg. Employee Hours | 1968 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2019 |
Annual Hours | 7275 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 1819 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2018 |
Annual Hours | 34696 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 15 |
Avg. Employee Hours | 2313 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2018 |
Annual Hours | 9011 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2253 |
Sub-Unit Desc | MILL OPERATION/PREPARATION PLANT |
Year | 2017 |
Annual Hours | 35207 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 16 |
Avg. Employee Hours | 2200 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2017 |
Annual Hours | 8516 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2129 |
Directions to Mine | From Nashville, TN take I-40 west to Exit 80, the 45-S bypass to 45-S, then Hwy 18-S to Bolivar, TN then Hwy. 125-S to Stateline, the Hwy 125 to Blue Mountain, MS , the right onto Hwy. 2 for about 5 miles to Rooker Rd on left, then Rooker Rd. for about 2 miles mine on right. |
Parties
Name | Kentucky-Tennessee Clay Company |
Role | Operator |
Start Date | 1999-03-01 |
End Date | 2001-03-27 |
Name | Kentucky-Tennessee Clay Company |
Role | Operator |
Start Date | 2001-03-28 |
Name | Imerys S A |
Role | Current Controller |
Start Date | 2001-03-28 |
Name | Kentucky-Tennessee Clay Company |
Role | Current Operator |
Inspections
Start Date | 2008-02-29 |
End Date | 2008-02-29 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 8.5 |
Start Date | 2007-12-18 |
End Date | 2007-12-19 |
Activity | Mine Idle Activity |
Number Inspectors | 1 |
Total Hours | 3 |
Start Date | 2006-04-17 |
End Date | 2006-04-18 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 12 |
Start Date | 2005-09-15 |
End Date | 2005-09-20 |
Activity | Regular Safety and Health Inspection |
Number Inspectors | 1 |
Total Hours | 24 |
Start Date | 2005-08-15 |
End Date | 2005-08-15 |
Activity | Compliance Follow-up Inspection |
Number Inspectors | 1 |
Total Hours | 2 |
Start Date | 2005-02-08 |
End Date | 2005-02-09 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 10 |
Start Date | 2003-12-10 |
End Date | 2003-12-11 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 17 |
Start Date | 2001-07-31 |
End Date | 2001-07-31 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 15 |
Start Date | 2000-04-25 |
End Date | 2000-05-02 |
Activity | REGULAR INSPECTION |
Number Inspectors | 1 |
Total Hours | 44 |
Productions
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2008 |
Annual Hours | 8 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 8 |
Sub-Unit Desc | OFFICE WORKERS AT MINE SITE |
Year | 2008 |
Annual Hours | 2 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 1 |
Avg. Employee Hours | 2 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2007 |
Annual Hours | 5230 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 1743 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2006 |
Annual Hours | 8366 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 4 |
Avg. Employee Hours | 2092 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2005 |
Annual Hours | 8268 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 5 |
Avg. Employee Hours | 1654 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2004 |
Annual Hours | 1539 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 513 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2003 |
Annual Hours | 1307 |
Annual Coal Prod | 0 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 436 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2001 |
Annual Hours | 3040 |
Avg. Annual Empl. | 6 |
Avg. Employee Hours | 507 |
Sub-Unit Desc | STRIP, QUARY, OPEN PIT |
Year | 2000 |
Annual Hours | 1451 |
Avg. Annual Empl. | 3 |
Avg. Employee Hours | 484 |
Date of last update: 17 Apr 2025
Sources: Mississippi Secretary of State