Name: | SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 26 Mar 1985 (40 years ago) |
Business ID: | 521856 |
ZIP code: | 39475 |
County: | Lamar |
State of Incorporation: | MISSISSIPPI |
Principal Office Address: | 40 Deep South LanePURVIS, MS 39475 |
Type | Company Name | Company Number | State |
---|---|---|---|
Headquarter of | SOUTHERN PRE-ENGINEERED BUILDERS, INC., FLORIDA | F11000004812 | FLORIDA |
Name | Role | Address |
---|---|---|
PAMELA LITTLE GRAHAM | Agent | 40 Deep South Lane, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Robert N Graham | Incorporator | PO Box1207, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Robert Jason Graham | Director | PO Box 1207, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Robert Jason Graham | President | PO Box 1207, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Vickie Williamson | Secretary | 18 Williamson Lane, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Vickie Williamson | Treasurer | 18 Williamson Lane, Purvis, MS 39475 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2025-02-24 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2024-02-29 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2023-02-20 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2022-03-08 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2021-03-15 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2020-02-17 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2019-02-13 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2018-02-20 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2017-02-14 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Annual Report | Filed | 2016-04-15 | Annual Report For SOUTHERN PRE-ENGINEERED BUILDERS, INC. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342655701 | 0419400 | 2017-09-15 | HWY 98 & LAKE FORGETFULL, HATTIESBURG, MS, 39403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260100 A |
Issuance Date | 2017-11-21 |
Current Penalty | 1477.8 |
Initial Penalty | 2463.0 |
Final Order | 2017-12-05 |
Nr Instances | 5 |
Nr Exposed | 5 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: Construction Site - On or about September 15, 2017 employees installing truss that were lifted into position by a crane were not wearing hard hats. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260453 B02 V |
Issuance Date | 2017-11-21 |
Current Penalty | 1477.8 |
Initial Penalty | 2463.0 |
Final Order | 2017-12-05 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift: (Note: As of January 1, 1998, subpart M of this part (1926.502(d)) provides that body belts are not acceptable as part of a personal fall arrest system. The use of a body belt in a tethering system or in a restraint system is acceptable and is regulated.) Construction Site - On or about September 15, 2017 employee worked from aerial lift without using fall restraint/protection. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260501 B01 |
Issuance Date | 2017-11-21 |
Current Penalty | 1847.4 |
Initial Penalty | 3079.0 |
Final Order | 2017-12-05 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: (a) Construction Site - On or about September 15, 2017 an employee climbed out of scissor lift and stood on framed wall without fall protection. |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2006-02-15 |
Emphasis | L: FALL |
Case Closed | 2006-03-14 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260453 B02 V |
Issuance Date | 2006-02-22 |
Abatement Due Date | 2006-02-27 |
Current Penalty | 500.0 |
Initial Penalty | 500.0 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 02 |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2004-11-05 |
Emphasis | L: FALL |
Case Closed | 2004-12-14 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 C02 IV |
Issuance Date | 2004-11-17 |
Abatement Due Date | 2004-11-23 |
Current Penalty | 375.0 |
Initial Penalty | 375.0 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 03 |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 VII |
Issuance Date | 2004-11-17 |
Abatement Due Date | 2004-11-23 |
Current Penalty | 375.0 |
Initial Penalty | 375.0 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 03 |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6651647010 | 2020-04-07 | 0470 | PPP | 40 DEEP SOUTH LN, PURVIS, MS, 39475-4547 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2879558404 | 2021-02-04 | 0470 | PPS | 40 Deep South Ln, Purvis, MS, 39475-4547 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 20 Apr 2025
Sources: Mississippi Secretary of State