Krystal Gravel-Harmony
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
Go 5 miles from Crystal Springs on Harmony Road to Bennet Rd.
|
Parties
Name
|
Krystal Gravel
|
Role
|
Operator
|
Start Date
|
1986-10-01
|
End Date
|
1990-04-01
|
|
Name
|
Krystal Gravel
|
Role
|
Operator
|
Start Date
|
1992-12-04
|
|
Name
|
Southwest Paving Inc
|
Role
|
Operator
|
Start Date
|
1990-04-02
|
End Date
|
1992-12-03
|
|
Name
|
Amy Sojourner Eversole
|
Role
|
Current Controller
|
Start Date
|
1992-12-04
|
|
Name
|
Krystal Gravel
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2017-08-10
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee had replaced a fuel filter on a dozer during routine preventative maintenance. During this process, ee gloves became wet with diesel fuel. When ee attempted to stand up, ee hands slipped off of the hand rails. This caused ee to fall backwards and land on the left side of ee body, and the left side of ee head.
|
|
Accident Date |
2017-03-15
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Not paying attention when departing truck/vehicle that was parked and not running. Missed last step and right ankle twisted.
|
|
Accident Date |
2016-04-25
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from scaffolds, walkways, platforms
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee was turning a nut with a wrench while performing routine maintenance on shaker. Employee slipped during this process and fell to the walkway causing lower back pain.
|
|
Inspections
Start Date |
2019-06-10
|
End Date |
2019-06-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.75
|
|
Start Date |
2019-01-29
|
End Date |
2019-01-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.25
|
|
Start Date |
2018-05-02
|
End Date |
2018-05-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Start Date |
2017-11-15
|
End Date |
2017-11-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2017-08-08
|
End Date |
2017-08-08
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Start Date |
2017-07-16
|
End Date |
2017-07-17
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
16.5
|
|
Start Date |
2017-06-06
|
End Date |
2017-06-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.5
|
|
Start Date |
2017-04-20
|
End Date |
2017-04-20
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2016-11-21
|
End Date |
2016-11-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2016-11-17
|
End Date |
2016-11-21
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
2
|
Total Hours |
33.5
|
|
Start Date |
2016-08-08
|
End Date |
2016-08-09
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2016-08-08
|
End Date |
2016-08-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.25
|
|
Start Date |
2015-12-21
|
End Date |
2015-12-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2015-07-28
|
End Date |
2015-07-28
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2015-04-28
|
End Date |
2015-04-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.75
|
|
Start Date |
2014-10-15
|
End Date |
2014-10-15
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2014-09-25
|
End Date |
2014-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.75
|
|
Start Date |
2014-07-17
|
End Date |
2014-07-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.5
|
|
Start Date |
2014-01-27
|
End Date |
2014-01-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
36.25
|
|
Start Date |
2013-04-17
|
End Date |
2013-04-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
22434
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
17
|
Avg. Employee Hours
|
1320
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1970
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1970
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
31472
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
2098
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
2356
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2356
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
26680
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
2052
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
3993
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1997
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
24740
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
16
|
Avg. Employee Hours
|
1546
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
10249
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1708
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
19869
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1806
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
5995
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1998
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
24338
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
1872
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
2597
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2597
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
26584
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
1899
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
2455
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2455
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
22007
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
1572
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
2007
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2007
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
19760
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
1520
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
1779
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1779
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
31729
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
19
|
Avg. Employee Hours
|
1670
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
3083
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1542
|
|
|
Sojourner Pit
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Parties
Name
|
Krystal Gravel
|
Role
|
Operator
|
Start Date
|
1990-07-01
|
|
Name
|
Amy Sojourner Eversole
|
Role
|
Current Controller
|
Start Date
|
1990-07-01
|
|
Name
|
Krystal Gravel
|
Role
|
Current Operator
|
|
|
Plant #3
|
Surface
|
Abandoned
|
Sand, Common
|
|
Directions to Mine |
At Crystal Springs City Limits on Hwy 27
|
Parties
Name
|
Krystal Gravel
|
Role
|
Operator
|
Start Date
|
2007-03-05
|
|
Name
|
Amy Sojourner Eversole
|
Role
|
Current Controller
|
Start Date
|
2007-03-05
|
|
Name
|
Krystal Gravel
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2008-02-06
|
End Date |
2008-02-06
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2007-09-10
|
End Date |
2007-09-11
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
19.5
|
|
Start Date |
2007-09-06
|
End Date |
2007-09-06
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2007-08-20
|
End Date |
2007-08-20
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2007-08-13
|
End Date |
2007-08-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
31.25
|
|
Start Date |
2007-03-05
|
End Date |
2007-04-11
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2007-03-05
|
End Date |
2007-03-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
8302
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2076
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
1906
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
953
|
|
|
Krystal Gravel-Hwy 27
|
Surface
|
Abandoned
|
Sand, Common
|
|
Directions to Mine |
Crystal Springs, MS. Hwy 27 intersection of Lee Ave(second caution light) take left, plant on left.
|
Parties
Name
|
Krystal Gravel
|
Role
|
Operator
|
Start Date
|
2007-07-12
|
|
Name
|
Amy Sojourner Eversole
|
Role
|
Current Controller
|
Start Date
|
2007-07-12
|
|
Name
|
Krystal Gravel
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2015-10-15
|
End Date |
2015-10-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2015-05-01
|
End Date |
2015-05-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2014-10-15
|
End Date |
2014-10-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2014-01-30
|
End Date |
2014-01-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2013-04-15
|
End Date |
2013-04-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2012-10-10
|
End Date |
2012-10-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2012-07-16
|
End Date |
2012-07-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2010-02-03
|
End Date |
2010-02-03
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2009-05-28
|
End Date |
2009-06-08
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
1
|
Total Hours |
23.5
|
|
Start Date |
2009-01-12
|
End Date |
2009-01-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2008-08-21
|
End Date |
2008-08-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2008-03-04
|
End Date |
2008-03-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Start Date |
2007-11-07
|
End Date |
2007-11-07
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2007-10-24
|
End Date |
2007-10-24
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2007-09-11
|
End Date |
2007-09-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
1177
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
589
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
561
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
561
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
2194
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1097
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
4747
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2374
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
4561
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2281
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
2057
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1029
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
8
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
8
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
3303
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1652
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
378
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
189
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
1858
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
929
|
|
|
Krystal Gravel-Coor Springs
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
I-65 to I-20 West to Jackson, MS. I-55 South to exit 68, go East past high school to Bradley Lane, turn right., go about 1 mile mine on right.
|
Parties
Name
|
Krystal Gravel Inc
|
Role
|
Operator
|
Start Date
|
2008-11-19
|
|
Name
|
Amy Sojourner Eversole
|
Role
|
Current Controller
|
Start Date
|
2008-11-19
|
|
Name
|
Krystal Gravel Inc
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2018-05-09
|
End Date |
2018-05-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2017-11-14
|
End Date |
2017-11-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2017-06-05
|
End Date |
2017-06-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2016-11-23
|
End Date |
2016-11-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2016-08-24
|
End Date |
2016-08-24
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2016-08-22
|
End Date |
2016-08-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
37.5
|
|
Start Date |
2015-10-19
|
End Date |
2015-10-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
37
|
|
Start Date |
2015-04-30
|
End Date |
2015-05-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.75
|
|
Start Date |
2014-09-25
|
End Date |
2014-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2014-07-10
|
End Date |
2014-07-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2014-01-30
|
End Date |
2014-01-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2013-04-16
|
End Date |
2013-04-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2012-10-04
|
End Date |
2012-10-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.75
|
|
Start Date |
2012-04-09
|
End Date |
2012-04-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2012-02-08
|
End Date |
2012-02-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2011-06-21
|
End Date |
2011-06-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2011-01-26
|
End Date |
2011-01-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2010-05-10
|
End Date |
2010-05-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
37.5
|
|
Start Date |
2010-01-13
|
End Date |
2010-01-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2009-07-27
|
End Date |
2009-07-27
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
8028
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1606
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
1978
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1978
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
10576
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2115
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
2495
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2495
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
17082
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
1898
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
1998
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1998
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
6399
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2133
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
2317
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2317
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
6687
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2229
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
3198
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1599
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
8885
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2221
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
3448
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1724
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
12175
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2435
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
2534
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2534
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
7589
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2530
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
2013
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2013
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
5599
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2800
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
1844
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1844
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
8019
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2005
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
1852
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1852
|
|
|
Scooter Mine
|
Surface
|
Active
|
Sand, Common
|
|
Directions to Mine |
I-55 to Hwy 27, south Hwy 27, turn right onto Ruby Road, at 4 way stop, straight it is now Harmony Road, go approx 6 miles, at stop sign take right and then immediate left onto Bailey Road, office is 2nd bldg. on the left. Lat. 31.923849 / Long. -90.273879
|
Parties
Name
|
Krystal Gravel
|
Role
|
Operator
|
Start Date
|
2019-08-07
|
End Date
|
2023-01-10
|
|
Name
|
APAC-MS, Inc.
|
Role
|
Operator
|
Start Date
|
2023-01-11
|
|
Name
|
CRH PLC
|
Role
|
Current Controller
|
Start Date
|
2023-01-11
|
|
Name
|
APAC-MS, Inc.
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2023-10-09
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Emp. was fueling the track hoe and standing on the tracks. The fuel trailer was backed up next to the tracks. As employee was waiting for the tank to fill they shifted their weight, lost balance and fell. Employee reached for the rail on the trailer and missed, falling in-between the trailer and the track, causing a fracture to their right forearm.
|
|
Inspections
Start Date |
2024-11-12
|
End Date |
2024-11-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2024-06-11
|
End Date |
2024-06-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2023-11-14
|
End Date |
2023-11-14
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2023-10-30
|
End Date |
2023-11-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.25
|
|
Start Date |
2023-06-06
|
End Date |
2023-06-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2022-11-07
|
End Date |
2022-11-09
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Start Date |
2022-10-26
|
End Date |
2022-10-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2022-04-20
|
End Date |
2022-04-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20.5
|
|
Start Date |
2021-10-20
|
End Date |
2021-10-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2021-08-09
|
End Date |
2021-08-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24.75
|
|
Start Date |
2021-02-22
|
End Date |
2021-02-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2020-07-20
|
End Date |
2020-07-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24.25
|
|
Start Date |
2020-01-29
|
End Date |
2020-01-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
23667
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
24
|
Avg. Employee Hours
|
986
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
2491
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2491
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
29346
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
23
|
Avg. Employee Hours
|
1276
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2542
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2542
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
27556
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
2296
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
3266
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1633
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
26498
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
2208
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
4137
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2069
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
33184
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
2212
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2584
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2584
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
11635
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
776
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
967
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
967
|
|
|