Name: | MUELLER COPPER TUBE COMPANY, INC. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Withdrawn |
Effective Date: | 27 Dec 1991 (33 years ago) |
Business ID: | 584780 |
State of Incorporation: | DELAWARE |
Principal Office Address: | 150 SCHILLING BLVD, SUITE 100COLLIERVILLE, TN 38017 |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | Agent | 645 LAKELAND EAST DR STE 101, FLOWOOD, MS 39232 |
Name | Role | Address |
---|---|---|
Devin Malone | President | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
Name | Role | Address |
---|---|---|
Jeffrey A Martin | Director | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
CHRISTOPHER J MIRITELLO | Director | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
Name | Role | Address |
---|---|---|
Jeffrey A Martin | Treasurer | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
Name | Role | Address |
---|---|---|
Jeffrey A Martin | Vice President | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
CHRISTOPHER J MIRITELLO | Vice President | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
Name | Role | Address |
---|---|---|
CHRISTOPHER J MIRITELLO | Secretary | 150 SCHILLING BLVD, SUITE 100, COLLIERVILLE, TN 38017 |
Type | Status | Filed Date | Description |
---|---|---|---|
Withdrawal | Filed | 2023-04-12 | Withdrawal For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2023-03-23 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2022-02-21 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2021-03-08 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2020-02-12 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2019-02-25 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2018-04-05 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2017-03-21 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2016-03-10 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Annual Report | Filed | 2015-03-16 | Annual Report For MUELLER COPPER TUBE COMPANY, INC. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
344761929 | 0419400 | 2020-05-22 | 400 MUELLER RD., FULTON, MS, 38843 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1592050 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100147 C04 I |
Issuance Date | 2020-07-16 |
Abatement Due Date | 2020-08-07 |
Current Penalty | 6488.4 |
Initial Penalty | 10814.0 |
Final Order | 2020-08-18 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. (a) South Cascade - On or about May 22, 2020 the employer did not have procedures for the control of energy sources for equipment when employees performed the cleaning operation exposing employees to caught-in hazards. (b) North Cascade - On or about May 22, 2020 the employer did not have procedures for the control of energy sources for equipment when employees performed the cleaning operation exposing employees to caught-in hazards. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19100212 A03 II |
Issuance Date | 2020-07-16 |
Current Penalty | 5898.6 |
Initial Penalty | 9831.0 |
Final Order | 2020-08-18 |
Nr Instances | 2 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded or guards were not designed and constructed to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s) (a) South Cascade - On or about May 22, 2020 the chiller process was not guarded exposing the operator to a caught-in hazard. (b) North Cascade - On or about May 22, 2020 the chiller process was not guarded exposing the operator to a caught-in hazard. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2017-02-21 |
Emphasis | N: AMPUTATE |
Case Closed | 2017-03-24 |
Related Activity
Type | Referral |
Activity Nr | 1183202 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100212 A03 II |
Issuance Date | 2017-03-10 |
Current Penalty | 7605.0 |
Initial Penalty | 12675.0 |
Final Order | 2017-03-24 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded or guards were not designed and constructed to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s) (a) Schumag #2130 - On or about February 21, 2017 the hydraulic clamping process was not properly guarded. |
Date of last update: 14 Mar 2025
Sources: Mississippi Secretary of State