Name: | FAIRLEY CONSTRUCTION CO., INC. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 10 Dec 1996 (28 years ago) |
Business ID: | 637010 |
ZIP code: | 39465 |
County: | Forrest |
State of Incorporation: | MISSISSIPPI |
Principal Office Address: | 828 Hwy 11Petal, MS 39465 |
Name | Role | Address |
---|---|---|
STEPHEN M FAIRLEY | Agent | 828 Hwy 11, Petal, MS 39465 |
Name | Role | Address |
---|---|---|
Stephen M Fairley | Incorporator | 106 Hickory Dr, Petal, MS 39465 |
Name | Role | Address |
---|---|---|
Stephen M Fairley | President | 828 Hwy 11, Petal, MS 39465 |
Name | Role | Address |
---|---|---|
Ashley K Fairley | Director | 828 Hwy 11, Petal, MS 39465 |
Wesley T Fairley | Director | 828 Hwy 11, Petal, MS 39465 |
Name | Role | Address |
---|---|---|
Ashley K Fairley | Vice President | 828 Hwy 11, Petal, MS 39465 |
Name | Role | Address |
---|---|---|
Wesley T Fairley | Secretary | 828 Hwy 11, Petal, MS 39465 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2024-04-10 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2024-03-26 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2023-04-13 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2022-04-06 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2021-01-18 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2020-04-13 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2019-04-12 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2018-03-27 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2017-03-01 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Annual Report | Filed | 2016-04-13 | Annual Report For FAIRLEY CONSTRUCTION CO., INC. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
341915247 | 0419400 | 2016-11-07 | 1272 EVELYN GANDY PARKWAY, PETAL, MS, 39465 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1153187 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260404 B01 II |
Issuance Date | 2017-01-05 |
Abatement Due Date | 2017-01-09 |
Current Penalty | 1796.0 |
Initial Penalty | 4490.0 |
Final Order | 2017-01-24 |
Nr Instances | 1 |
Nr Exposed | 5 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection. (a) Rear of building - on or about November 15, 2016 workers building the commercial building were using receptacles to power their equipment and tools that was supplied by the contractor that were not protected by a ground fault circuit interrupter. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260405 A02 II A |
Issuance Date | 2017-01-05 |
Abatement Due Date | 2017-01-09 |
Current Penalty | 1418.5 |
Initial Penalty | 2181.0 |
Final Order | 2017-01-24 |
Nr Instances | 2 |
Nr Exposed | 5 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(a)(2)(ii)(A): Temporary wiring feeder conductors were not run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, run as open conductors on insulators not more than 10 feet apart: (a) South side of building - On or about November 15, 2016 the employer had placed the temporary electrical power to the exterior lights and outlets on the driveway where vehicle traffic must pass multiple times a day with no protection from physical damage or environmental damage. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260405 B01 |
Issuance Date | 2017-01-05 |
Abatement Due Date | 2017-01-09 |
Current Penalty | 1770.5 |
Initial Penalty | 2726.0 |
Final Order | 2017-01-24 |
Nr Instances | 1 |
Nr Exposed | 5 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(b)(1): Unused openings in cabinets, boxes, and fittings were not effectively closed: (a) Rear of building - On or about November 15, 2016 employees using electrical power from panel box on pole is missing two blank cover plates on panel buss bar exposing live wires inside. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260405 E01 |
Issuance Date | 2017-01-05 |
Abatement Due Date | 2017-01-09 |
Current Penalty | 980.5 |
Initial Penalty | 1636.0 |
Final Order | 2017-01-24 |
Nr Instances | 2 |
Nr Exposed | 5 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(e)(1): Cabinets, cutout boxes, fittings, boxes, and panelboard enclosures in damp or wet locations were not installed so as to prevent moisture or water from entering and accumulating within the enclosures: (a) Bach of building - On or about November 15, 2016 employees are plugging their extension cords into an job made outlet box that is not weather proof and the parking lot lights wiring is spliced in a ceiling round junction box that is not weather proof. |
Citation ID | 01005 |
Citaton Type | Serious |
Standard Cited | 19260405 G02 III |
Issuance Date | 2017-01-05 |
Abatement Due Date | 2017-01-09 |
Current Penalty | 1796.0 |
Initial Penalty | 4490.0 |
Final Order | 2017-01-24 |
Nr Instances | 1 |
Nr Exposed | 5 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(g)(2)(iii): The repair splice in a hard service flexible cord No. 12 or larger did not retain the insulation, outer sheath properties, and usage characteristics of the cord which was being used: (a) Rear of building - On or about November 15, 2016 employees were using an electrical extension that was hard wired into the panel box that has two splices that did not retain the insulation factor of the outer sheathing properties. |
Date of last update: 16 Mar 2025
Sources: Mississippi Secretary of State