Search icon

FAIRLEY CONSTRUCTION CO., INC.

Company Details

Name: FAIRLEY CONSTRUCTION CO., INC.
Jurisdiction: MISSISSIPPI
Business Type: Profit Corporation
Status: Good Standing
Effective Date: 10 Dec 1996 (28 years ago)
Business ID: 637010
ZIP code: 39465
County: Forrest
State of Incorporation: MISSISSIPPI
Principal Office Address: 828 Hwy 11Petal, MS 39465

Agent

Name Role Address
STEPHEN M FAIRLEY Agent 828 Hwy 11, Petal, MS 39465

Incorporator

Name Role Address
Stephen M Fairley Incorporator 106 Hickory Dr, Petal, MS 39465

President

Name Role Address
Stephen M Fairley President 828 Hwy 11, Petal, MS 39465

Director

Name Role Address
Ashley K Fairley Director 828 Hwy 11, Petal, MS 39465
Wesley T Fairley Director 828 Hwy 11, Petal, MS 39465

Vice President

Name Role Address
Ashley K Fairley Vice President 828 Hwy 11, Petal, MS 39465

Secretary

Name Role Address
Wesley T Fairley Secretary 828 Hwy 11, Petal, MS 39465

Filings

Type Status Filed Date Description
Annual Report Filed 2024-04-10 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2024-03-26 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2023-04-13 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2022-04-06 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2021-01-18 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2020-04-13 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2019-04-12 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2018-03-27 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2017-03-01 Annual Report For FAIRLEY CONSTRUCTION CO., INC.
Annual Report Filed 2016-04-13 Annual Report For FAIRLEY CONSTRUCTION CO., INC.

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
341915247 0419400 2016-11-07 1272 EVELYN GANDY PARKWAY, PETAL, MS, 39465
Inspection Type Complaint
Scope Complete
Safety/Health Safety
Close Conference 2016-11-07
Emphasis L: FALL
Case Closed 2018-02-01

Related Activity

Type Complaint
Activity Nr 1153187
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260404 B01 II
Issuance Date 2017-01-05
Abatement Due Date 2017-01-09
Current Penalty 1796.0
Initial Penalty 4490.0
Final Order 2017-01-24
Nr Instances 1
Nr Exposed 5
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection. (a) Rear of building - on or about November 15, 2016 workers building the commercial building were using receptacles to power their equipment and tools that was supplied by the contractor that were not protected by a ground fault circuit interrupter.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260405 A02 II A
Issuance Date 2017-01-05
Abatement Due Date 2017-01-09
Current Penalty 1418.5
Initial Penalty 2181.0
Final Order 2017-01-24
Nr Instances 2
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.405(a)(2)(ii)(A): Temporary wiring feeder conductors were not run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, run as open conductors on insulators not more than 10 feet apart: (a) South side of building - On or about November 15, 2016 the employer had placed the temporary electrical power to the exterior lights and outlets on the driveway where vehicle traffic must pass multiple times a day with no protection from physical damage or environmental damage.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260405 B01
Issuance Date 2017-01-05
Abatement Due Date 2017-01-09
Current Penalty 1770.5
Initial Penalty 2726.0
Final Order 2017-01-24
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.405(b)(1): Unused openings in cabinets, boxes, and fittings were not effectively closed: (a) Rear of building - On or about November 15, 2016 employees using electrical power from panel box on pole is missing two blank cover plates on panel buss bar exposing live wires inside.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260405 E01
Issuance Date 2017-01-05
Abatement Due Date 2017-01-09
Current Penalty 980.5
Initial Penalty 1636.0
Final Order 2017-01-24
Nr Instances 2
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.405(e)(1): Cabinets, cutout boxes, fittings, boxes, and panelboard enclosures in damp or wet locations were not installed so as to prevent moisture or water from entering and accumulating within the enclosures: (a) Bach of building - On or about November 15, 2016 employees are plugging their extension cords into an job made outlet box that is not weather proof and the parking lot lights wiring is spliced in a ceiling round junction box that is not weather proof.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260405 G02 III
Issuance Date 2017-01-05
Abatement Due Date 2017-01-09
Current Penalty 1796.0
Initial Penalty 4490.0
Final Order 2017-01-24
Nr Instances 1
Nr Exposed 5
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.405(g)(2)(iii): The repair splice in a hard service flexible cord No. 12 or larger did not retain the insulation, outer sheath properties, and usage characteristics of the cord which was being used: (a) Rear of building - On or about November 15, 2016 employees were using an electrical extension that was hard wired into the panel box that has two splices that did not retain the insulation factor of the outer sheathing properties.

Date of last update: 16 Mar 2025

Sources: Mississippi Secretary of State