Name: | Kappa Development & General Contracting, Inc. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 21 Aug 1998 (27 years ago) |
Business ID: | 660302 |
ZIP code: | 39475 |
County: | Lamar |
State of Incorporation: | MISSISSIPPI |
Principal Office Address: | 105 Bayberry Loop SPurvis, MS 39475 |
Name | Role | Address |
---|---|---|
Donald L Parker | Incorporator | PO Box2753ave, Gulfport, MS 39505 |
Raymond A Blacklidge | Incorporator | PO Box2753ake, Gulfport, MS 39505 |
Name | Role | Address |
---|---|---|
Robert Allen | Vice President | 105 Bayberry loop S, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Robert Allen | Director | 105 Bayberry loop S, Purvis, MS 39475 |
Name | Role | Address |
---|---|---|
Robert Allen | Agent | 105 Bayberry Loop S, Purvis, MS 39475 |
Type | Status | Filed Date | Description |
---|---|---|---|
Amendment Form | Filed | 2025-01-04 | Amendment For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2025-01-04 | Annual Report For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2024-01-12 | Annual Report For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2023-01-19 | Annual Report For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2022-09-15 | Annual Report For Kappa Development & General Contracting, Inc. |
Notice to Dissolve/Revoke | Filed | 2022-09-05 | Notice of Intent to Dissolve: AR: Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2021-01-04 | Annual Report For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2020-01-14 | Annual Report For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2019-01-16 | Annual Report For Kappa Development & General Contracting, Inc. |
Annual Report | Filed | 2018-02-05 | Annual Report For Kappa Development & General Contracting, Inc. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
343014593 | 0419400 | 2018-03-13 | INTERSECTION OF AVE. C AND 28TH ST,, HATTIESBURG, MS, 39403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1317959 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260652 B02 |
Issuance Date | 2018-06-27 |
Abatement Due Date | 2018-07-13 |
Current Penalty | 800.0 |
Initial Penalty | 3880.0 |
Final Order | 2018-07-24 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.652(b)(2): Maximum allowable slopes, and allowable configurations for sloping and benching systems, was not determined in accordance with the conditions and requirements set forth in Appendices A and B to this subpart. a. Ave. C, Camp Shelby - On or about March 13, 2108 a trench excavation for the replacement of 48 inch corrugated metal pipes was not slopped correctly. A top section of the trench that was underneath a roadway collapsed and slid into the trench where an employee was working. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19040039 A02 |
Issuance Date | 2018-06-27 |
Abatement Due Date | 2018-07-13 |
Current Penalty | 200.0 |
Initial Penalty | 2772.0 |
Final Order | 2018-07-24 |
Nr Instances | 1 |
Nr Exposed | 7 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1904.39(a)(2): The employer did not report within 24-hours a work-related incident resulting in in-patient hospitalization, amputation or the loss of an eye. a. Ave. C, Camp Shelby - On or about March 13, 2018 the hospitalization of an employee that was injured while working in a trench was no reported to OSHA within 24 hours. |
Date of last update: 17 Mar 2025
Sources: Mississippi Secretary of State