Name: | BROCATO CONSTRUCTION, INC. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 28 Jan 1998 (27 years ago) |
Business ID: | 727421 |
ZIP code: | 38606 |
County: | Panola |
State of Incorporation: | MISSISSIPPI |
Principal Office Address: | 1847 Brewer RoadBATEVILLE, MS 38606 |
Name | Role | Address |
---|---|---|
CHRIS BROCATO | Agent | 1847 Brewer Road, BATEVILLE, MS 38606 |
Name | Role | Address |
---|---|---|
Chris Brocato | President | 1847 Brewer Road, Batesville, MS 38606 |
Name | Role | Address |
---|---|---|
Chris Brocato | Secretary | 1847 Brewer Road, Batesville, MS 38606 |
Name | Role | Address |
---|---|---|
Chris Brocato | Treasurer | 1847 Brewer Road, Batesville, MS 38606 |
Name | Role | Address |
---|---|---|
Chris Brocato | Vice President | 1847 Brewer Road, Batesville, MS 38606 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2024-02-19 | Annual Report For BROCATO CONSTRUCTION, INC. |
Annual Report | Filed | 2023-03-15 | Annual Report For BROCATO CONSTRUCTION, INC. |
Annual Report | Filed | 2022-03-31 | Annual Report For BROCATO CONSTRUCTION, INC. |
Annual Report | Filed | 2021-04-13 | Annual Report For BROCATO CONSTRUCTION, INC. |
Annual Report | Filed | 2020-09-29 | Annual Report For BROCATO CONSTRUCTION, INC. |
Notice to Dissolve/Revoke | Filed | 2020-08-28 | Notice to Dissolve/Revoke |
Annual Report | Filed | 2019-08-28 | Annual Report For BROCATO CONSTRUCTION, INC. |
Notice to Dissolve/Revoke | Filed | 2019-08-22 | Notice to Dissolve/Revoke |
Annual Report | Filed | 2018-07-25 | Annual Report For BROCATO CONSTRUCTION, INC. |
Annual Report | Filed | 2017-09-18 | Annual Report For BROCATO CONSTRUCTION, INC. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
343544151 | 0419400 | 2018-10-18 | 443 COVENANT DRIVE, BATESVILLE, MS, 38606 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1392335 |
Safety | Yes |
Health | Yes |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2012-05-01 |
Emphasis | N: TRENCH |
Case Closed | 2023-03-30 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260651 C02 |
Issuance Date | 2012-10-01 |
Current Penalty | 5600.0 |
Initial Penalty | 5600.0 |
Contest Date | 2012-10-09 |
Final Order | 2013-05-01 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: South Jobsite - On or about April 12, 2012 employees were working in a 5 feet 06 inch deep excavation. The excavation that did not have a safe means to enter or exit. |
Citation ID | 02001 |
Citaton Type | Willful |
Standard Cited | 19260652 A01 |
Issuance Date | 2012-10-01 |
Current Penalty | 56000.0 |
Initial Penalty | 56000.0 |
Contest Date | 2012-10-09 |
Final Order | 2013-04-26 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.652(a)(1): Each employee in an excavation shall be protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section except when: South Jobsite - On or about April 12, 2012 employees were working in 5 feet 06 inch deep excavation. Employees working in type B soil were not protected from cave-in hazard by a trench shield protective system or a sloping and benching system. |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2012-05-01 |
Emphasis | N: TRENCH |
Case Closed | 2023-03-29 |
Violation Items
Citation ID | 01001 |
Citaton Type | Willful |
Standard Cited | 19260652 A01 |
Issuance Date | 2012-10-01 |
Current Penalty | 56000.0 |
Initial Penalty | 56000.0 |
Contest Date | 2012-10-09 |
Final Order | 2013-04-26 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.652(a)(1): Each employee in an excavation shall be protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section except when: North Jobsite - On or about April 12, 2012 employee was working in an excavation 8 feet in depth. Employee working in type C soil was not protected from cave-in hazard by a trench shield protective system or a sloping and benching system. |
Status | User ID | Name of Firm | Trade Name | UEI | Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Active | P3175907 | BROCATO CONSTRUCTION, INC. | BROCATO CONSTRUCTION INC | JNHCFZR2J296 | 1847 BREWER RD, BATESVILLE, MS, 38606-8001 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
HUBZone Certified | No |
Women Owned Certified | No |
Women Owned Pending | No |
Economically Disadvantaged Women Owned Certified | No |
Economically Disadvantaged Women Owned Pending | No |
Veteran-Owned Small Business Certified | No |
Veteran-Owned Small Business Joint Venture | No |
Service-Disabled Veteran-Owned Small Business Certified | No |
Service-Disabled Veteran-Owned Small Business Joint Venture | No |
Bonding Levels
Description | Construction Bonding Level (per contract) |
Level | $0 |
Description | Construction Bonding Level (aggregate) |
Level | $0 |
Description | Service Bonding Level (per contract) |
Level | $0 |
Description | Service Bonding Level (aggregate) |
Level | $0 |
NAICS Codes with Size Determinations by NAICS
Primary | Yes |
Code | 237110 |
NAICS Code's Description | Water and Sewer Line and Related Structures Construction |
Buy Green | Yes |
Code | 221210 |
NAICS Code's Description | Natural Gas Distribution |
Buy Green | Yes |
Code | 221310 |
NAICS Code's Description | Water Supply and Irrigation Systems |
Buy Green | Yes |
Code | 221320 |
NAICS Code's Description | Sewage Treatment Facilities |
Buy Green | Yes |
Code | 237120 |
NAICS Code's Description | Oil and Gas Pipeline and Related Structures Construction |
Buy Green | Yes |
Code | 237990 |
NAICS Code's Description | Other Heavy and Civil Engineering ConstructionGeneral $39.50m Small Business Size Standard: [Yes]Special $32.50m Dredging and Surface Cleanup Activities: [Yes] (4) |
Buy Green | Yes |
Code | 238120 |
NAICS Code's Description | Structural Steel and Precast Concrete Contractors |
Buy Green | Yes |
Code | 238910 |
NAICS Code's Description | Site Preparation Contractors |
Buy Green | Yes |
Export Profile (Trade Mission Online)
Exporter | Firm hasn't answered this question yet |
Export Business Activities | (none given) |
Exporting to | (none given) |
Desired Export Business Relationships | (none given) |
Description of Export Objective(s) | (none given) |
Date of last update: 20 Mar 2025
Sources: Mississippi Secretary of State