Company Details
Name: |
GRAY CONSTRUCTION, INC. |
Jurisdiction: |
MISSISSIPPI |
Business Type: |
Profit Corporation |
Status: |
Dissolved
|
Effective Date: |
26 Feb 2003 (22 years ago)
|
Business ID: |
729976 |
State of Incorporation: |
MISSISSIPPI |
Agent
Name |
Role |
Address |
ROBERT F HARENSKI
|
Agent
|
1906 PASS RD, BILOXI, MS 39531
|
Incorporator
Name |
Role |
Address |
ROBERT G HARENSKI
|
Incorporator
|
1906 PASS RD, BILOXI, MS 39531
|
Filings
Type |
Status |
Filed Date |
Description |
Admin Dissolution
|
Filed
|
2004-12-28
|
Admin Dissolution
|
Notice to Dissolve/Revoke
|
Filed
|
2004-10-20
|
Notice to Dissolve/Revoke
|
Name Reservation Form
|
Filed
|
2003-02-26
|
Name Reservation
|
Amendment Form
|
Filed
|
2003-02-25
|
Amendment
|
OSHA's Inspections within Industry
Inspection Nr |
Report ID |
Date Opened |
Site Address |
|
339815441
|
0419400
|
2014-06-17
|
4594 CAYCE ROAD, BYHALIA, MS, 38611
|
|
Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2014-06-17
|
Emphasis |
L: FALL
|
Case Closed |
2014-08-15
|
Related Activity
Type |
Complaint |
Activity Nr |
893795 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19261431 E06 |
Issuance Date |
2014-07-15 |
Current Penalty |
2250.0 |
Initial Penalty |
3750.0 |
Final Order |
2014-08-07 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1431(e)(6): The personnel platform must be equipped with a guardrail system which meets the requirements of subpart M of this part, and must be enclosed at least from the toeboard to mid-rail with either solid construction material or expanded metal having openings no greater than �½ inch (1.27 cm). Points to which personal fall arrest systems are attached must meet the anchorage requirements in subpart M of this part. (a) Jobsite - On or about June 18, 2014 employee worked from a scissor lift suspended by a Lima 990T truck mounted boom crane. The work platform was not enclosed from the toeboard to the mid-rail. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19261431 E07 |
Issuance Date |
2014-07-15 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-08-07 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1431(e)(7): A grab rail must be installed inside the entire perimeter of the personnel platform except for access gates/doors. (a) Jobsite - On or about June 18, 2014 employee worked from a scissor lift suspended by a Lima 990T truck mounted boom crane. The work platform did not have a grab rail. |
|
|
Date of last update: 20 Mar 2025
Sources:
Mississippi Secretary of State