Search icon

GRAY CONSTRUCTION, INC.

Company Details

Name: GRAY CONSTRUCTION, INC.
Jurisdiction: MISSISSIPPI
Business Type: Profit Corporation
Status: Dissolved
Effective Date: 26 Feb 2003 (22 years ago)
Business ID: 729976
State of Incorporation: MISSISSIPPI

Agent

Name Role Address
ROBERT F HARENSKI Agent 1906 PASS RD, BILOXI, MS 39531

Incorporator

Name Role Address
ROBERT G HARENSKI Incorporator 1906 PASS RD, BILOXI, MS 39531

Filings

Type Status Filed Date Description
Admin Dissolution Filed 2004-12-28 Admin Dissolution
Notice to Dissolve/Revoke Filed 2004-10-20 Notice to Dissolve/Revoke
Name Reservation Form Filed 2003-02-26 Name Reservation
Amendment Form Filed 2003-02-25 Amendment

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339815441 0419400 2014-06-17 4594 CAYCE ROAD, BYHALIA, MS, 38611
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2014-06-17
Emphasis L: FALL
Case Closed 2014-08-15

Related Activity

Type Complaint
Activity Nr 893795
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19261431 E06
Issuance Date 2014-07-15
Current Penalty 2250.0
Initial Penalty 3750.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1431(e)(6): The personnel platform must be equipped with a guardrail system which meets the requirements of subpart M of this part, and must be enclosed at least from the toeboard to mid-rail with either solid construction material or expanded metal having openings no greater than �½ inch (1.27 cm). Points to which personal fall arrest systems are attached must meet the anchorage requirements in subpart M of this part. (a) Jobsite - On or about June 18, 2014 employee worked from a scissor lift suspended by a Lima 990T truck mounted boom crane. The work platform was not enclosed from the toeboard to the mid-rail.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19261431 E07
Issuance Date 2014-07-15
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1431(e)(7): A grab rail must be installed inside the entire perimeter of the personnel platform except for access gates/doors. (a) Jobsite - On or about June 18, 2014 employee worked from a scissor lift suspended by a Lima 990T truck mounted boom crane. The work platform did not have a grab rail.

Date of last update: 20 Mar 2025

Sources: Mississippi Secretary of State