Name: | TG Missouri Corporation |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 20 Mar 2008 (17 years ago) |
Business ID: | 929070 |
State of Incorporation: | MISSOURI |
Principal Office Address: | 195 Corporate DriveBatesville, MO 38606 |
Name | Role | Address |
---|---|---|
Robert Patrick | Director | 2200 Plattin Road, Perryville, MO 63775 |
Yoshihiko Hishiki | Director | 2200 Plattin Rd., Perryville, MO 63775 |
Nobuhisa Tanaka | Director | 1400 Stephenson Hwy., Troy, MI 48083 |
Tadashi Yamamoto | Director | 1 Haruhinagahata, Kiyosu, Aichi, Japan 452-8564 |
Tomoo Sato | Director | 1 Nagahata, Ochiai, Haryhi-cho, Japan 4528564 |
Kenji Hayashi | Director | 1 Haruhinagahata, Kiyosu, Aichi, Japan 452-8564 |
Toru Koyama | Director | 1400 Stephenson Hwy., Troy, MI 48038 |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | Agent | 645 LAKELAND EAST DRIVE, Suite 101, FLOWOOD, MS 39232 |
Name | Role | Address |
---|---|---|
Robert Patrick | President | 2200 Plattin Road, Perryville, MO 63775 |
Name | Role | Address |
---|---|---|
Robert Patrick | Secretary | 2200 Plattin Road, Perryville, MO 63775 |
Name | Role | Address |
---|---|---|
Yoshihiko Hishiki | Vice President | 2200 Plattin Rd., Perryville, MO 63775 |
Takehito Nakayama | Vice President | 2200 Plattin Road, Perryville, MO 63775 |
Name | Role | Address |
---|---|---|
Osuke Mizuno | Treasurer | 1400 Stephenson Hwy, Troy, MI 48083 |
Name | Role | Address |
---|---|---|
Nobuhisa Tanaka | Chairman | 1400 Stephenson Hwy., Troy, MI 48083 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2024-04-08 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2023-04-14 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2022-04-14 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2021-04-13 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2020-05-14 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2019-04-26 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2018-06-15 | Annual Report For TG Missouri Corporation |
Annual Report | Filed | 2017-07-20 | Annual Report For TG Missouri Corporation |
Reinstatement | Filed | 2016-05-06 | Reinstatement For TG Missouri Corporation |
Admin Dissolution | Filed | 2013-10-01 | Admin Dissolution |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342181310 | 0419400 | 2017-03-17 | 195 CORPORATE DRIVE, BATESVILLE, MS, 38606 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1191175 |
Health | Yes |
Inspection Type | FollowUp |
Scope | Partial |
Safety/Health | Health |
Close Conference | 2016-05-23 |
Case Closed | 2016-08-09 |
Related Activity
Type | Inspection |
Activity Nr | 1117824 |
Safety | Yes |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2016-01-14 |
Emphasis | N: AMPUTATE, L: AUTOSUP, P: AUTOSUP |
Case Closed | 2016-05-05 |
Related Activity
Type | Inspection |
Activity Nr | 1132817 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100147 C06 I |
Issuance Date | 2016-04-06 |
Abatement Due Date | 2016-05-19 |
Current Penalty | 2550.0 |
Initial Penalty | 4250.0 |
Final Order | 2016-04-20 |
Nr Instances | 1 |
Nr Exposed | 68 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Plant Site - On or about January 14, 2016 the employer had not conducted periodic inspections of the specific energy control procedures to determine if the procedures were correct and that employees were performing the requirements of the standard. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19100242 B |
Issuance Date | 2016-04-06 |
Abatement Due Date | 2016-04-14 |
Current Penalty | 1530.0 |
Initial Penalty | 2550.0 |
Final Order | 2016-04-20 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 psi: (a) 8HS591 Area - On or about January 14, 2016 air pressure at the air nozzle used to clean dust off of parts and the area measured at 80 psi. |
Date of last update: 22 Mar 2025
Sources: Mississippi Secretary of State