Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2014-05-06
|
Emphasis |
L: FALL, P: FALL
|
Case Closed |
2019-05-28
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 |
Issuance Date |
2014-05-29 |
Abatement Due Date |
2014-06-10 |
Current Penalty |
2800.0 |
Initial Penalty |
2800.0 |
Final Order |
2014-06-24 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports. a) Front of house - On or about May 6, 2014, subcontractors were using supported scaffolding that was not fully decked. The scaffolding was provided and erected by J.B. Construction, LLC. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 C02 |
Issuance Date |
2014-05-29 |
Abatement Due Date |
2014-06-05 |
Current Penalty |
1200.0 |
Initial Penalty |
1200.0 |
Final Order |
2014-06-24 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights were not on base plates and mud sills or other adequate firm foundation. a) Front of house - On or about May 6, 2014, subcontractors were using a supported scaffold that did not have base plates under the legs. The scaffold was provided and erected by J.B. Construction, LLC. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 |
Issuance Date |
2014-05-29 |
Abatement Due Date |
2014-06-10 |
Current Penalty |
2800.0 |
Initial Penalty |
2800.0 |
Final Order |
2014-06-24 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1): 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level: a) Front of house - On or about May 6, 2014, subcontractors were using supported scaffolding that did not have guardrails. The scaffolding was provided and erected by J.B. Construction, LLC. |
|
|