Name: | Custom Engineered Wheels, Inc. |
Jurisdiction: | MISSISSIPPI |
Business Type: | Profit Corporation |
Status: | Good Standing |
Effective Date: | 16 Nov 2009 (15 years ago) |
Business ID: | 956708 |
ZIP code: | 38824 |
County: | Prentiss |
State of Incorporation: | DELAWARE |
Principal Office Address: | 309 Robert M. Coggins Jr. DriveBaldwyn, MS 38824 |
Fictitious names: |
CEW, Inc. |
Name | Role | Address |
---|---|---|
CORPORATION SERVICE COMPANY | Agent | 109 Executive Drive, Suite 3, Madison, MS 39110 |
Name | Role | Address |
---|---|---|
Gene Rudolph | President | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Name | Role | Address |
---|---|---|
Deanna Miller | Secretary | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Name | Role | Address |
---|---|---|
Deanna Miller | Treasurer | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Name | Role | Address |
---|---|---|
Deanna Miller | Chief Financial Officer | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Name | Role | Address |
---|---|---|
Michael J. Mahoney | Director | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Petter Ostberg | Director | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Name | Role | Address |
---|---|---|
Brandon C. Richter | Chairman | 309 Robert M. Coggins Jr. Drive, Baldwyn, MS 38824 |
Type | Status | Filed Date | Description |
---|---|---|---|
Annual Report | Filed | 2024-03-20 | Annual Report For Custom Engineered Wheels, Inc. |
Annual Report | Filed | 2023-04-07 | Annual Report For Custom Engineered Wheels, Inc. |
Annual Report | Filed | 2022-04-20 | Annual Report For Custom Engineered Wheels, Inc. |
Registered Agent Change of Address | Filed | 2022-03-31 | Agent Address Change For CORPORATION SERVICE COMPANY |
Annual Report | Filed | 2021-04-14 | Annual Report For Custom Engineered Wheels, Inc. |
Annual Report | Filed | 2020-04-03 | Annual Report For Custom Engineered Wheels, Inc. |
Annual Report | Filed | 2019-04-01 | Annual Report for Custom Engineered Wheels, Inc. |
Registered Agent Change of Address | Filed | 2018-06-15 | Agent Address Change For CORPORATION SERVICE COMPANY |
Annual Report | Filed | 2018-03-22 | Annual Report For Custom Engineered Wheels, Inc. |
Annual Report | Filed | 2017-03-02 | Annual Report For Custom Engineered Wheels, Inc. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
346237860 | 0419400 | 2022-09-21 | 309 ROBERT M. COGGINS JR. DR., BALDWYN, MS, 38824 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
343724456 | 0419400 | 2019-01-09 | 309 ROBERT M. COGGINS JR. DR., BALDWYN, MS, 38824 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1413695 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100022 A01 |
Issuance Date | 2019-03-18 |
Current Penalty | 3069.0 |
Initial Penalty | 5115.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.22(a)(1): Floor aisles and passageways were not kept clear creating trip hazards in the workplace. (a) Injection Molder No. 10 Bearing Machine - On or about January 09, 2019 the employer did not ensure extension cords and air hoses were maintained in wakways to prevent employees exposure to tripping hazards. |
Citation ID | 01002A |
Citaton Type | Serious |
Standard Cited | 19100028 B01 I |
Issuance Date | 2019-03-18 |
Abatement Due Date | 2019-04-09 |
Current Penalty | 7160.4 |
Initial Penalty | 11934.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.28(b)(1)(i): The employer did not ensure that each employee on a walking-working surface with an unprotected side or edge that is 4 feet (1.2m) or more above a lower level was protected from falling by guardrail systems, safety net system, or personal fall arrest system: (a) Facility - On or about January 09, 2019 the employer did not provide a means of fall protection for employees working 4 feet or more above the concrete floor while performing service and maintenance of injection molders and Fanuc robots exposing employees to fall hazards. |
Citation ID | 01002B |
Citaton Type | Serious |
Standard Cited | 19100028 B01 I A |
Issuance Date | 2019-03-18 |
Abatement Due Date | 2019-04-09 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-04-17 |
Nr Instances | 2 |
Nr Exposed | 3 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.28(b)(1)(i)(A): The employer did not ensure that each employee on a walking-working surface with an unprotected side or edge that is 4 feet (1.2 m) or more above a lower level was protected from falling by a standard guardrail system. (a) Injection molders No. 2 and No. 14 - On or about January 09, 2019 the employer did not ensure that an approximately 8 feet high elevated platform walkway above the injection molders was provided with a standard guardrail on one end exposing employees to fall hazards onto the injection molders and/or the concrete floor below. |
Citation ID | 01002C |
Citaton Type | Serious |
Standard Cited | 19100030 A01 |
Issuance Date | 2019-03-18 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.30(a)(1): Before any employee is exposed to a fall hazard, the employer did not provide training for each employee who uses personal fall protection systems or who was required to be trained as specified elsewhere in this subpart. (a) Facility - On or about January 09, 2019 the employer had not completed fall hazard training for employees that work above 4 feet in height performing service and maintenance of injection molders and Fanuc robots exposing employees to fall hazards. |
Citation ID | 01003A |
Citaton Type | Serious |
Standard Cited | 19100147 C01 |
Issuance Date | 2019-03-18 |
Abatement Due Date | 2019-04-16 |
Current Penalty | 7160.4 |
Initial Penalty | 11934.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 4 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(1): Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative. (a) Facility - On or about January 09, 2019 the employer did not have an energy control program for employees that performing servicing and maintenance of 25 injection molders and Fanuc robots with energy control procedures, documented training, and periodic inspections for employees that maintain exposing employees to caught-in and struck-by hazards. |
Citation ID | 01003B |
Citaton Type | Serious |
Standard Cited | 19100147 C04 I |
Issuance Date | 2019-03-18 |
Abatement Due Date | 2019-04-16 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. (a) Facility - On or about January 09, 2019 the employer did not have procedures specific to each machine developed, documented and utilized for the control of energy sources of equipment such as but not limited to, 25 injection molders and Fanuc robots when employees performed servicing and maintenance exposing employees to caught-in and struck-by hazards. |
Citation ID | 01003C |
Citaton Type | Serious |
Standard Cited | 19100147 C06 I |
Issuance Date | 2019-03-18 |
Abatement Due Date | 2019-04-16 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Facility - On or about January 09, 2019 the employer had not performed the required periodic inspection of their energy control procedures for equipment such as but not limited to, 25 injection molders and Fanuc robots prior to employees performing servicing and maintenance exposing employees to caught-in and struck-by hazards. |
Citation ID | 01003D |
Citaton Type | Serious |
Standard Cited | 19100147 C07 I |
Issuance Date | 2019-03-18 |
Abatement Due Date | 2019-04-16 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: (a) Facility - On or about January 09, 2019 the employer had not provided adequate training to the employees on energy control procedures for equipment such as but not limited to, 25 injection molders and Fanuc robots prior to employees performing servicing and maintenance exposing employees to caught-in and struck-by hazards. |
USDOT Number | Carrier Operation | MCS-150 Form Date | MCS-150 Mileage | MCS-150 Year | Power Units | Drivers | Operation Classification | |||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
454270 | Intrastate Non-Hazmat | 2023-10-25 | 4378 | 2022 | 1 | 1 | Private(Property) | |||||||||||||||||||||||||||||||||||||||||||||||||||
|
Total Number of Inspections for the measurement period (24 months) | 0 |
Driver Fitness BASIC Serious Violation Indicator | No |
Vehicle Maintenance BASIC Acute/Critical Indicator | No |
Unsafe Driving BASIC Acute/Critical Indicator | No |
Driver Fitness BASIC Roadside Performance measure value | 0 |
Hours-of-Service (HOS) Compliance BASIC Roadside Performance measure value | 0 |
Total Number of Driver Inspections for the measurment period | 0 |
Vehicle Maintenance BASIC Roadside Performance measure value | 0 |
Total Number of Vehicle Inspections for the measurement period | 0 |
Controlled Substances and Alcohol BASIC Roadside Performance measure value | 0 |
Unsafe Driving BASIC Roadside Performance Measure Value | 0 |
Number of inspections with at least one Driver Fitness BASIC violation | 0 |
Number of inspections with at least one Hours-of-Service BASIC violation | 0 |
Total Number of Driver Inspections containing at least one Driver Out-of-Service Violation | 0 |
Number of inspections with at least one Vehicle Maintenance BASIC violation | 0 |
Total Number of Vehicle Inspections containing at least one Vehicle Out-of-Service violation | 0 |
Number of inspections with at least one Controlled Substances and Alcohol BASIC violation | 0 |
Number of inspections with at least one Unsafe Driving BASIC violation | 0 |
Date of last update: 23 Mar 2025
Sources: Mississippi Secretary of State