Search icon

Phoenix Construction LLC

Company Details

Name: Phoenix Construction LLC
Jurisdiction: MISSISSIPPI
Business Type: Limited Liability Company
Status: Good Standing
Effective Date: 03 Dec 2010 (14 years ago)
Business ID: 975275
ZIP code: 39540
County: Harrison
State of Incorporation: MISSISSIPPI
Principal Office Address: 5255 Whetstone roadD'iberville, MS 39540
Historical names: Phoenix Constriction L. L. C.

Agent

Name Role Address
Miles Buchanan Agent 5255 Whetstone road, Diberville, MS 39540

Member

Name Role Address
miles buchanan Member 5255 Whetstone road, Diberville, MS 39540

Manager

Name Role Address
John buchanan Manager 16321 Trenton Dr., biloxi, MS 39532
David Buchanan Manager 4374 Audubon Trails, biloxi, MS 39532

Other

Name Role Address
John buchanan Other 16321 Trenton Dr., biloxi, MS 39532

Filings

Type Status Filed Date Description
Annual Report LLC Filed 2024-03-06 Annual Report For Phoenix Construction LLC
Annual Report LLC Filed 2023-08-17 Annual Report For Phoenix Construction LLC
Annual Report LLC Filed 2022-10-17 Annual Report For Phoenix Construction LLC
Notice to Dissolve/Revoke Filed 2022-09-05 Notice of Intent to Dissolve: AR: Phoenix Construction LLC
Amendment Form Filed 2022-03-30 Amendment For Phoenix Construction LLC
Annual Report LLC Filed 2021-09-17 Annual Report For Phoenix Construction LLC
Notice to Dissolve/Revoke Filed 2021-09-07 Notice of Intent to Dissolve: AR: Phoenix Construction LLC
Annual Report LLC Filed 2020-09-17 Annual Report For Phoenix Construction LLC
Notice to Dissolve/Revoke Filed 2020-08-28 Notice to Dissolve/Revoke
Annual Report LLC Filed 2019-08-20 Annual Report For Phoenix Construction LLC

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339025165 0419400 2013-04-10 121 SOUTHTOWN AVENUE, RIDGELAND, MS, 39157
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2013-04-12
Emphasis N: CTARGET, L: FORKLIFT, L: FALL, P: FALL
Case Closed 2018-08-13

Related Activity

Type Inspection
Activity Nr 902393
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260453 B02 V
Issuance Date 2013-05-20
Abatement Due Date 2013-05-20
Current Penalty 1836.0
Initial Penalty 1836.0
Final Order 2013-06-18
Nr Instances 2
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.453(b)(2)(v): A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift. Note to paragraph (b)(2)(v): As of January 1, 1998, subpart M of this part (1926.502(d)) provides that body belts are not acceptable as part of a personal fall arrest system. The use of a body belt in a tethering system or in a restraint system is acceptable and is regulated under 1926.502(e). (a) Northwest Corner Window - On or about April 10, 2013 two employees were exposed to a fall hazard while working in a JLG 600S Aerial Lift (serial no. 518505RA). Employees were elevated 16 feet above the ground with no lanyard attached to their body harnesses.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260701 B
Issuance Date 2013-05-20
Abatement Due Date 2013-05-20
Current Penalty 1224.0
Initial Penalty 1224.0
Final Order 2013-06-18
Nr Instances 2
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.701(b): Reinforcing steel. All protruding reinforcing steel, onto and into which employees could fall, shall be guarded to eliminate the hazard of impalement. (a) Northwest Corner of Building - On or about April 10, 2013 two employees were exposed to an impalement hazard while working above protruding reinforced steel. Employees were working in an aerial lift.
337530810 0419400 2012-11-21 4302 WEST BEACH BLVD, GULFPORT, MS, 39501
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2012-11-21
Emphasis L: FALL
Case Closed 2015-11-25

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260452 W02
Issuance Date 2012-11-28
Abatement Due Date 2012-12-17
Current Penalty 1020.0
Initial Penalty 1020.0
Final Order 2012-12-24
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(w)(2): Scaffold casters and wheels were not locked with positive wheel and/or wheel and swivel locks, or equivalent means, to prevent movement of the scaffold while the scaffold was used in a stationary manner: a) 4302 West Beach Blvd - On or about November 21, 2012, the scaffold wheels were not locked while it was being used by an employee applying stucco overhead.

Court Cases

Docket Number Nature of Suit Filing Date Disposition
1300302 Other Contract Actions 2013-12-17 settled
Circuit Fifth Circuit
Origin original proceeding
Jurisdiction diversity of citizenship
Jury Demand Defendant demands jury
Demanded Amount 0
Termination Class Action Missing
Procedural Progress other
Nature Of Judgment no monetary award
Judgement missing
Arbitration On Termination Missing
Office 3
Filing Date 2013-12-17
Termination Date 2014-10-14
Date Issue Joined 2014-01-29
Section 1332
Sub Section DS
Status Terminated

Parties

Name DDG Construction, Inc.
Role Plaintiff
Name Phoenix Construction LLC
Role Defendant

Date of last update: 24 Mar 2025

Sources: Mississippi Secretary of State